First tests with the new ECRH System
for ASDEX Upgrade
D.
Wagner, G. Grünwald, F. Leuterer, A. Manini, F. Monaco, M. Münich, F. Ryter, H.
Schütz,
H.
Zohm, T. Franke
Max-Planck-Institut für Plasmaphysik, D-85748
Garching, Germany
2) R. Heidinger, 1) K. Koppenburg, 1)M. Thumm
Forschungszentrum Karlsruhe, 1) Institut
für Hochleistungsimpuls- und Mikrowellentechnik, 2) Institut für
Materialforschung, D-76021 Karlsruhe, Germany
W.
Kasparek, G. Gantenbein
Institut
für Plasmaforschung, Universität Stuttgart, D-70569 Stuttgart, Germany
G.G.
Denisov, A. Litvak, V. Zapevalov
Institute of Applied Physics, RAS, 603600
Nizhny Novgorod, Russia
The first two-frequency gyrotron of the new ASDEX
Upgrade has been installed and is currently put into operation. In its final
stage the system will have 4 step-tunable gyrotrons working in the frequency
range 105-140 GHz with a total power of 4 MW and a pulse duration of 10s.
Particular features of the system are broadband transmission components and a
tunable double disk vacuum window at the torus. It also contains fast moveable
mirrors for a feedback controlled localized power deposition.