Status of the Wendelstein7-X ECRH system
Laqua H.P., Brand P., Braune H., Dammertz G., Erckmann V.,
Gantenbein G., Hollmann F., Jonitz L., Michel G., Noke F., Purps F., Schulz
T.,. Weissgerber M:
Abstract:
The progress in installation of the ECRH system will
be reported. Four of 10 gyrotrons have been installed know. The latest test
results will be presented. Different ECRH scenarios for the W7-X operation have
been investigated by detailed ray-tracing calculation. The ECRH Launching
system is being presently designed to fulfil all the requirement of the
different scenarios. The development and test of the critical components will
be reported.